API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)

API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Kantle Diameter Botenya ba Lerako FOB TIANJIN Kantle Diameter Botenya ba Lerako FOB TIANJIN
外径 (mm) 壁厚 (mm) 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON
219,245 5.0-11.75 707.91 426 5.75-11.75 721.63
273 5.0-11.75 707.91 12.5-13.75 728.49
12.5-13.75 714.77 457,478 5.75-11.75 735.35
299 5.5-11.75 707.91 12.5-13.75 742.21
12.5-13.75 714.77 14.5-17.75 749.07
325 5.5-11.75 707.91 508 5.75-11.75 735.35
12.5-13.75 714.77 12.5-13.75 742.21
355 5.5-11.75 728.49 14.5-17.75 749.07
12.5-13.75 735.35 529/559/610/630 5.75-11.75 749.07
377 5.75-11.75 728.49 12.5-13.75 755.93
12.5-13.75 735.35 14.5-17.75 762.79
406 5.75-11.75 728.49 660 7.5-11.75 769.65
12.5-13.75 735.35 12.5-13.75 776.51
/ / 14.5-17.75 783.37
Hlokomela:
1. Theko e ka holimo e thehiloe pipe ea BARE;
2. Theko e ka holimo e thehiloe ho FOB TIANJIN;
3. Theko e ka holimo HA E kenyeletse tefiso efe kapa efe ea ho paka le ho emisa ho sebetsa, bakeng sa khotheishene e felletseng;
4. Theko e ka holimo e sebetsa feela nakong ea Jan. 9th - Jan. 16th
5. MOQ e sebetsang bakeng sa lenane lena la theko e feta lithane tse 25;

Nako ea poso: Jan-09-2021