API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)

API 5L/ASTM A53 GR.B (Hot Rolled ERW Steel Pipe)
Kantle Diameter Botenya ba Lerako FOB TIANJIN Kantle Diameter Botenya ba Lerako FOB TIANJIN
外径 (mm) 壁厚 (mm) 离港价 USD/TON 外径 (mm) 壁厚 (mm) 离港价 USD/TON
219,245 5.0-11.75 649.25 426 5.75-11.75 689.15
273 5.0-11.75 649.25 12.5-13.75 696.01
12.5-13.75 655.90 457,478 5.75-11.75 702.87
299 5.5-11.75 649.25 12.5-13.75 709.73
12.5-13.75 655.90 14.5-17.75 716.59
325 5.5-11.75 649.25 508 5.75-11.75 702.87
12.5-13.75 655.90 12.5-13.75 709.73
355 5.5-11.75 669.22 14.5-17.75 716.59
12.5-13.75 675.88 529/559/610/630 5.75-11.75 716.59
377 5.75-11.75 669.22 12.5-13.75 723.45
12.5-13.75 675.88 14.5-17.75 730.31
406 5.75-11.75 669.22 660 7.5-11.75 737.17
12.5-13.75 675.88 12.5-13.75 744.03
/ / 14.5-17.75 750.89
Hlokomela:
1. Theko e ka holimo e thehiloe pipe ea BARE;
2. Theko e ka holimo e thehiloe ho FOB TIANJIN;
3. Theko e ka holimo HA E kenyeletse tefiso efe kapa efe ea ho paka le ho emisa ho sebetsa, bakeng sa khotheishene e felletseng;
4. Theko e ka holimo e sebetsa feela nakong ea Jan. 2nd - Jan. 8th
5. MOQ e sebetsang bakeng sa lenane lena la theko e feta lithane tse 25;

Nako ea poso: Jan-02-2021