API 5L/ASTM A53 GR.B, TŠEPE YA CARBON, PIPE YA SSAW STEEL

API 5L/ASTM A53 GR.B, TŠEPE YA CARBON, PIPE YA SSAW STEEL
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
219 273 324 356 406 457 508 610 711 762 813 914
Botenya ba Lerako 6 914 914 914 914 914 914 914 914 914 914 914 914
壁厚 (mm) 7 914 914 914 914 914 914 914 914 914 914 914 914
8 914 914 914 914 914 914 914 914 914 914 914 914
9 914 914 914 914 914 914 914 914 914 914
10 914 914 914 914 914 914 914 914 914 914
11 914 914 914 914 914 914 914 914 914 914
12 914 914 914 914 914 914 914 914 914 914
13 923 930 930 930 930
14 923 930 930 930 930
15 942
16 942
FOB TIANJIN
USD/TON
Outside Diameter 外径 (mm)
1016 1067 1118 1168 1219 1321 1422 1524 1626 1727 1829 1930
Botenya ba Lerako 6 914 930 930 930 930 930 930
壁厚 (mm) 7 914 930 930 930 930 930 930 938 938
8 914 930 930 930 930 930 930 938 938
9 914 930 930 930 930 930 930 938 938
10 914 930 930 930 930 930 930 938 938
11 914 930 930 930 930 930 930 938 938 938 945 945
12 914 930 930 930 930 930 930 938 938 938 945 945
13 930 945 945 945 945 945 945 950 950 950 950 973
14 930 945 945 945 945 945 945 950 950 950 950 973
15 942 958 958 958 958 958 958 966 966 966 966 989
16 942 958 958 958 958 958 958 966 966 966 966 989
17 958 958 958 973 973 1020 1020 1020
18 958 958 958 973 973 1020 1020 1020
19 1020 1020
20 1020 1020
Hlokomela:
1. Theko e ka holimo e itšetlehile ka liphaephe tsa BARE;
2. Theko e ka holimo e thehiloe ho FOB TIANJIN;
3. Theko e ka holimo ha e kenyeletse tefo ea ho paka le ho felisa ts'ebetso;
4. Theko e ka holimo e sebetsa feela nakong ea May 27th-June 3rd;
5. MOQ e sebetsang bakeng sa lenane lena la theko e feta lithane tse 25;
6. Bakeng sa boitsebiso bo eketsehileng le theko ea CIF, ka kopo ikopanye le rona;

Nako ea poso: May-31-2021