| API 5L/ASTM A53 GR.B, TŠEPE YA CARBON, PIPE YA SSAW STEEL | |||||||||||||
| EXW TIANJIN USD/TON | Outside Diameter 外径 (mm) | ||||||||||||
| 219 | 273 | 324 | 356 | 406 | 457 | 508 | 610 | 711 | 762 | 813 | 914 | ||
| Botenya ba Lerako | 6 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 |
| 壁厚 (mm) | 7 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 |
| 8 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 9 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 10 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 11 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 12 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 13 | / | / | / | / | / | / | / | $575.55 | $580.79 | $580.79 | $580.79 | $580.79 | |
| 14 | / | / | / | / | / | / | / | $575.55 | $580.79 | $580.79 | $580.79 | $580.79 | |
| 15 | / | / | / | / | / | / | / | / | / | / | / | $591.28 | |
| 16 | / | / | / | / | / | / | / | / | / | / | / | $591.28 | |
| 17 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 18 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 19 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 20 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| EXW TIANJIN USD/TON | Outside Diameter 外径 (mm) | ||||||||||||
| 1016 | 1067 | 1118 | 1168 | 1219 | 1321 | 1422 | 1524 | 1626 | 1727 | 1829 | 1930 | ||
| Botenya ba Lerako | 6 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | / | / | / | / | / |
| 壁厚 (mm) | 7 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / |
| 8 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 9 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 10 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 11 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | $587.35 | $593.90 | $593.90 | |
| 12 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | $587.35 | $593.90 | $593.90 | |
| 13 | $580.79 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $597.84 | $597.84 | $597.84 | $597.84 | $617.50 | |
| 14 | $580.79 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $597.84 | $597.84 | $597.84 | $597.84 | $617.50 | |
| 15 | $591.28 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $610.95 | $610.95 | $610.95 | $610.95 | $630.61 | |
| 16 | $591.28 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $610.95 | $610.95 | $610.95 | $610.95 | $630.61 | |
| 17 | / | / | / | / | $604.39 | $604.39 | $604.39 | $617.50 | $617.50 | $656.83 | $656.83 | $656.83 | |
| 18 | / | / | / | / | $604.39 | $604.39 | $604.39 | $617.50 | $617.50 | $656.83 | $656.83 | $656.83 | |
| 19 | / | / | / | / | / | / | / | / | / | / | $656.83 | $656.83 | |
| 20 | / | / | / | / | / | / | / | / | / | / | $656.83 | $656.83 | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| Hlokomela: | |||||||||||||
| 1. Theko e ka holimo e thehiloe pipe e se nang letho, bakeng sa ho roala ho eketsehileng, ka kopo ikopanye le rona; | |||||||||||||
| 2. Theko e ka holimo e thehiloe ho EXW, bakeng sa theko ea FOB / CIF / CFR, ka kopo ikopanye le rona; | |||||||||||||
| 3. Theko e ka holimo ha e kenyeletse tefiso efe kapa efe ea ho paka le ho emisa ts'ebetso, bakeng sa khotheishene e felletseng; | |||||||||||||
| 4. Theko e ka holimo e sebetsa feela ho Oct. 2nd; | |||||||||||||
| 5. MOQ e sebetsang bakeng sa lenane lena la theko e feta lithane tse 25; | |||||||||||||
Nako ea poso: Sep-25-2020