| API 5L GR.B/ASTM A53 GR.B, CARBON STEEL, LSAW STEEL PIPE | |||||||||
| EXW TIANJIN | Outside Diameter 外径 (mm) | ||||||||
| USD/TON | 406 | 457 | 508 | 609.6 | 711.1 | 762 | 812 | 863.6 | |
| Lerako | 8 | $709.28 | $702.72 | $709.28 | $696.17 | $696.17 | $696.17 | $696.17 | $696.17 | 
| Botenya | 9.53 | $702.72 | $689.61 | $696.17 | $676.50 | $676.50 | $676.50 | $676.50 | $676.50 | 
| 壁厚 (mm) | 10 | $669.94 | $656.83 | $663.39 | $676.50 | $676.50 | $676.50 | $676.50 | $676.50 | 
| 12 | $669.94 | $656.83 | $663.39 | $676.50 | $676.50 | $676.50 | $676.50 | $676.50 | |
| 14 | $669.94 | $656.83 | $663.39 | $676.50 | $676.50 | $676.50 | $676.50 | $676.50 | |
| 16 | $669.94 | $669.94 | $676.50 | $663.39 | $663.39 | $663.39 | $663.39 | $663.39 | |
| 18 | / | $669.94 | $676.50 | $663.39 | $663.39 | $663.39 | $663.39 | $663.39 | |
| 20 | / | / | $676.50 | $663.39 | $663.39 | $663.39 | $663.39 | $663.39 | |
| 22 | / | / | $676.50 | $663.39 | $663.39 | $663.39 | $663.39 | $663.39 | |
| 24 | / | / | $676.50 | $663.39 | $663.39 | $663.39 | $663.39 | $663.39 | |
| 26 | / | / | / | $676.50 | $663.39 | $663.39 | $663.39 | $663.39 | |
| 28 | / | / | / | / | $663.39 | $663.39 | $663.39 | $663.39 | |
| 30 | / | / | / | / | $663.39 | $663.39 | $663.39 | $663.39 | |
| 32 | / | / | / | / | $676.50 | $676.50 | $676.50 | $676.50 | |
| 34 | / | / | / | / | / | / | $676.50 | $676.50 | |
| 36 | / | / | / | / | / | / | $676.50 | $676.50 | |
| 38 | / | / | / | / | / | / | / | / | |
| 40 | / | / | / | / | / | / | / | / | |
| EXW TIANJIN | Outside Diameter 外径 (mm) | ||||||||
| USD/TON | 914 | 1016 | 1066.7 | 1117.6 | 1219.2 | 1320.8 | 1422.4 | / | |
| Lerako | 8 | $696.17 | $696.17 | $702.72 | $702.72 | / | / | / | / | 
| Botenya | 9.53 | $696.17 | $696.17 | $696.17 | $696.17 | $696.17 | $742.05 | $728.94 | / | 
| 壁厚 (mm) | 10 | $676.50 | $676.50 | $683.05 | $683.05 | $683.05 | $755.16 | $755.16 | / | 
| 12 | $676.50 | $676.50 | $669.94 | $669.94 | $669.94 | $702.72 | $755.16 | / | |
| 14 | $676.50 | $676.50 | $669.94 | $669.94 | $669.94 | $702.72 | $755.16 | / | |
| 16 | $663.39 | $683.05 | $669.94 | $669.94 | $669.94 | $702.72 | $748.61 | / | |
| 18 | $663.39 | $683.05 | $669.94 | $669.94 | $669.94 | $702.72 | $748.61 | / | |
| 20 | $663.39 | $683.05 | $669.94 | $669.94 | $669.94 | $702.72 | $748.61 | / | |
| 22 | $663.39 | $683.05 | $669.94 | $669.94 | $669.94 | $702.72 | $748.61 | / | |
| 24 | $663.39 | $683.05 | $669.94 | $669.94 | $669.94 | $702.72 | $748.61 | / | |
| 26 | $663.39 | $683.05 | $669.94 | $669.94 | $669.94 | $702.72 | $748.61 | / | |
| 28 | $650.28 | $669.94 | $656.83 | $656.83 | $656.83 | $702.72 | $748.61 | / | |
| 30 | $650.28 | $669.94 | $683.05 | $683.05 | $683.05 | $702.72 | $748.61 | / | |
| 32 | $663.39 | $683.05 | $683.05 | $683.05 | $683.05 | $715.83 | $755.16 | / | |
| 34 | $663.39 | $683.05 | $689.61 | $689.61 | $689.61 | $715.83 | $755.16 | / | |
| 36 | $663.39 | $683.05 | $689.61 | $689.61 | $689.61 | $715.83 | $755.16 | / | |
| 38 | $663.39 | $683.05 | $689.61 | $689.61 | $689.61 | $715.83 | $755.16 | / | |
| 40 | / | / | / | / | / | $715.83 | $755.16 | / | |
| Hlokomela: | |||||||||
| 1. Theko e ka holimo e thehiloe pipe ea BARE, bakeng sa ho roala ho eketsehileng, ka kopo ikopanye le rona; | |||||||||
| 2. Theko e ka holimo e thehiloe ho EXW, bakeng sa theko ea FOB / CIF / CFR, ka kopo ikopanye le rona; | |||||||||
| 3. Theko e kaholimo HA E kenyeletse tefiso efe kapa efe ea ho paka le ho emisa tšebetso, bakeng sa khotheishene e felletseng; | |||||||||
| 4. Theko e ka holimo e sebetsa feela ho Oct. 2nd; | |||||||||
| 5. MOQ e sebetsang bakeng sa lenane lena la theko e feta lithane tse 25; | |||||||||
Nako ea poso: Sep-25-2020
