ERW Steel Pipe Präis 8. Juli 2021

API 5L/ASTM A106 GR.B, ERW Carbon Steel Pipe
公称通径
DN
外径OD (mm) SCH40 (6m/5.8m) SCH80 (6m/5.8m) SCH160 (6m/5.8m)
壁厚WT FOB 壁厚WT FOB 壁厚WT FOB
(mm) USD/TON (mm) USD/TON (mm) USD/TON
1/4" 13.7 2.24 951,85 3.02 951,85 / /
3/8" 17.1 2.31 951,85 3.2 951,85 / /
1/2" 21.3 2.77 951,85 3.73 951,85 4,78 977.13
3/4" 26.7 2,87 951,85 3,91 951,85 5,56 977.13
1" 33.4 3.38 951,85 4,55 951,85 6,35 977.13
1-1/4" 42.2 3,56 951,85 4,85 951,85 6,35 977.13
1-1/2" 48,3 3.68 844,39 5.08 844,39 7.14 869,67
2" 60,3 3,91 844,39 5,54 844,39 8,74 869,67
2-1/2" 73 5.16 819,10 7.01 819,10 9,53 844,39
3" 88,9 5.49 819,10 7.62 819,10 11.13 844,39
3-1/2" 101,6 5.74 819,10 8.08 819,10 / /
4" 114,3 6.02 819,10 8,56 819,10 13.49 844,39
5" 141,3 6,55 819,10 9,53 819,10 15.88 844,39
6" 168,3 7.11 819,10 10,97 819,10 18.26 844,39
8" 219,1 8.18 819,10 12.7 819,10 23.01 844,39
10" 273 9.27 819,10 15.09 819,10 28.58 844,39
12" 323,8 10.31 819,10 17.48 819,10 33.32 844,39
14" 355,6 9,53 844,39 11.13 844,39 19.05 869,67
16" 406,4 9,53 850,71 12.7 850,71 21.44 875,99
18" 457 9,53 819,10 14.27 23,83
20" 508 9,53 819,10 15.09 26.19
24" 610 9,53 819,10 17.48 30,96
1. Den uewe genannte Präis baséiert op bloe Päifen;
2. Den uewe genannte Präis baséiert op FOB TIANJIN duerch BULK Sendung;
3. Den uewe genannte Präis enthält keng Verpackungs- an Ennveraarbechtungskäschte;
4. Den uewe genannte Präis gëllt nëmme während dem 8. Juli bis de 14. Juli;
5. Déi applicabel MOQ fir dës Präislëscht ass iwwer 25 Tonnen;

Post Zäit: Jul-08-2021