| API 5L/ASTM A53 GR.B, કાર્બન સ્ટીલ, SSAW સ્ટીલ પાઇપ | |||||||||||||
| EXW ટિઆન્જિન USD/TON | બહારનો વ્યાસ 外径 (mm) | ||||||||||||
| 219 | 273 | 324 | 356 | 406 | 457 | 508 | 610 | 711 | 762 | 813 | 914 | ||
| દીવાલ ની જાડાઈ | 6 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 |
| 壁厚 (mm) | 7 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 |
| 8 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 9 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 10 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 11 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 12 | / | / | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | $607.98 | |
| 13 | / | / | / | / | / | / | / | $616.09 | $621.50 | $621.50 | $621.50 | $621.50 | |
| 14 | / | / | / | / | / | / | / | $616.09 | $621.50 | $621.50 | $621.50 | $621.50 | |
| 15 | / | / | / | / | / | / | / | / | / | / | / | $632.30 | |
| 16 | / | / | / | / | / | / | / | / | / | / | / | $632.30 | |
| 17 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 18 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 19 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 20 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| EXW ટિઆન્જિન USD/TON | બહારનો વ્યાસ 外径 (mm) | ||||||||||||
| 1016 | 1067 | 1118 | 1168 | 1219 | 1321 | 1422 | 1524 | 1626 | 1727 | 1829 | 1930 | ||
| દીવાલ ની જાડાઈ | 6 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | / | / | / | / | / |
| 壁厚 (mm) | 7 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / |
| 8 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / | |
| 9 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / | |
| 10 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | / | / | / | |
| 11 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | $628.25 | $635.01 | $635.01 | |
| 12 | $607.98 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $621.50 | $628.25 | $628.25 | $628.25 | $635.01 | $635.01 | |
| 13 | $621.50 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $639.06 | $639.06 | $639.06 | $639.06 | $659.33 | |
| 14 | $621.50 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $635.01 | $639.06 | $639.06 | $639.06 | $639.06 | $659.33 | |
| 15 | $632.30 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $652.57 | $652.57 | $652.57 | $652.57 | $672.84 | |
| 16 | $632.30 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $645.82 | $652.57 | $652.57 | $652.57 | $652.57 | $672.84 | |
| 17 | / | / | / | / | $645.82 | $645.82 | $645.82 | $659.33 | $659.33 | $699.86 | $699.86 | $699.86 | |
| 18 | / | / | / | / | $645.82 | $645.82 | $645.82 | $659.33 | $659.33 | $699.86 | $699.86 | $699.86 | |
| 19 | / | / | / | / | / | / | / | / | / | / | $699.86 | $699.86 | |
| 20 | / | / | / | / | / | / | / | / | / | / | $699.86 | $699.86 | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| નૉૅધ: | |||||||||||||
| 1. ઉપરોક્ત કિંમત એકદમ પાઇપ પર આધારિત છે, વધારાના કોટિંગ માટે, કૃપા કરીને અમને; | |||||||||||||
| 2. ઉપરોક્ત કિંમત EXW પર આધારિત છે, FOB/CIF/CFR કિંમત માટે, કૃપા કરીને અમને જણાવો; | |||||||||||||
| 3. વિગતવાર અવતરણ માટે ઉપરોક્ત કિંમતમાં કોઈપણ પેકિંગ અને અંતિમ પ્રક્રિયા ચાર્જનો સમાવેશ થતો નથી; | |||||||||||||
| 4. ઉપરોક્ત કિંમત માત્ર ડિસેમ્બર 1લી સુધી માન્ય છે; | |||||||||||||
| 5. આ કિંમત સૂચિ માટે લાગુ MOQ 25 ટનથી વધુ છે; | |||||||||||||
પોસ્ટ સમય: નવેમ્બર-26-2020