| API 5L/ASTM A53 GR.B, કાર્બન સ્ટીલ, SSAW સ્ટીલ પાઇપ | |||||||||||||
| EXW ટિઆન્જિન USD/TON | બહારનો વ્યાસ 外径 (mm) | ||||||||||||
| 219 | 273 | 324 | 356 | 406 | 457 | 508 | 610 | 711 | 762 | 813 | 914 | ||
| દીવાલ ની જાડાઈ | 6 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 |
| 壁厚 (mm) | 7 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 |
| 8 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 9 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 10 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 11 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 12 | / | / | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | $567.68 | |
| 13 | / | / | / | / | / | / | / | $575.55 | $580.79 | $580.79 | $580.79 | $580.79 | |
| 14 | / | / | / | / | / | / | / | $575.55 | $580.79 | $580.79 | $580.79 | $580.79 | |
| 15 | / | / | / | / | / | / | / | / | / | / | / | $591.28 | |
| 16 | / | / | / | / | / | / | / | / | / | / | / | $591.28 | |
| 17 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 18 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 19 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 20 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| EXW ટિઆન્જિન USD/TON | બહારનો વ્યાસ 外径 (mm) | ||||||||||||
| 1016 | 1067 | 1118 | 1168 | 1219 | 1321 | 1422 | 1524 | 1626 | 1727 | 1829 | 1930 | ||
| દીવાલ ની જાડાઈ | 6 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | / | / | / | / | / |
| 壁厚 (mm) | 7 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / |
| 8 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 9 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 10 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | / | / | / | |
| 11 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | $587.35 | $593.90 | $593.90 | |
| 12 | $567.68 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $580.79 | $587.35 | $587.35 | $587.35 | $593.90 | $593.90 | |
| 13 | $580.79 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $597.84 | $597.84 | $597.84 | $597.84 | $617.50 | |
| 14 | $580.79 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $593.90 | $597.84 | $597.84 | $597.84 | $597.84 | $617.50 | |
| 15 | $591.28 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $610.95 | $610.95 | $610.95 | $610.95 | $630.61 | |
| 16 | $591.28 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $604.39 | $610.95 | $610.95 | $610.95 | $610.95 | $630.61 | |
| 17 | / | / | / | / | $604.39 | $604.39 | $604.39 | $617.50 | $617.50 | $656.83 | $656.83 | $656.83 | |
| 18 | / | / | / | / | $604.39 | $604.39 | $604.39 | $617.50 | $617.50 | $656.83 | $656.83 | $656.83 | |
| 19 | / | / | / | / | / | / | / | / | / | / | $656.83 | $656.83 | |
| 20 | / | / | / | / | / | / | / | / | / | / | $656.83 | $656.83 | |
| 22 | / | / | / | / | / | / | / | / | / | / | / | / | |
| 24 | / | / | / | / | / | / | / | / | / | / | / | / | |
| નૉૅધ: | |||||||||||||
| 1. ઉપરોક્ત કિંમત એકદમ પાઇપ પર આધારિત છે, વધારાના કોટિંગ માટે, કૃપા કરીને અમારો સંપર્ક કરો; | |||||||||||||
| 2. ઉપરોક્ત કિંમત EXW પર આધારિત છે, FOB/CIF/CFR કિંમત માટે, કૃપા કરીને અમારો સંપર્ક કરો; | |||||||||||||
| 3. વિગતવાર અવતરણ માટે ઉપરોક્ત કિંમતમાં કોઈપણ પેકિંગ અને અંતિમ પ્રક્રિયા ચાર્જનો સમાવેશ થતો નથી; | |||||||||||||
| 4. ઉપરોક્ત કિંમત માત્ર 2જી ઑક્ટોબર સુધી માન્ય છે; | |||||||||||||
| 5. આ કિંમત સૂચિ માટે લાગુ MOQ 25 ટનથી વધુ છે; | |||||||||||||
પોસ્ટ સમય: સપ્ટેમ્બર-25-2020