Pipe d'acciaio senza saldatura Prezzu u 9 di ghjugnu 2021

API 5L/ASTM A106 GR.B, Tube d'acier au carbone sans soudure
公称通径
DN
外径OD (mm) SCH40 (6 m/5,8 m) SCH80 (6 m/5,8 m) SCH160 (6 m/5,8 m)
壁厚WT FOB 壁厚WT FOB 壁厚WT FOB
(mm) USD/TON (mm) USD/TON (mm) USD/TON
1/4” 13.7 2.24 1.475,71 3.02 1.453,16 / /
3/8” 17.1 2.31 1.337,43 3.2 1.317,01 / /
1/2” 21.3 2.77 1.116,19 3.73 1.099,18 4.78 1.153,64
3/4” 26.7 2.87 1.088,54 3.91 1.071,95 5.56 1.099,18
1" 33.4 3.38 988,98 4.55 973,92 6.35 1.001,15
1-1/4" 42.2 3.56 961,33 4,85 946,69 6.35 973,92
1-1/2" 48.3 3.68 954,41 5.08 939,88 7.14 967.11
2" 60.3 3.91 940,59 5.54 926,27 8.74 953,50
2-1/2" 73 5.16 925,38 7.01 911.29 9.53 938,52
3" 88.9 5.49 925,38 7.62 911.29 11.13 938,52
3-1/2" 101.6 5.74 950,27 8.08 935,80 /
4" 114.3 6.02 914.31 8.56 900,40 13.49 927,63
5" 141.3 6.55 914.31 9.53 900,40 15.88 927,63
6" 168.3 7.11 910.17 10.97 896,32 18.26 923,55
8" 219.1 8.18 910.17 12.7 896,32 23.01 923,55
10" 273 9.27 904,63 15.09 890,87 28.58 918.10
12" 323,8 10.31 904,63 17.48 890,87 33.32 918.10
14" 355,6 9.53 998,66 11.13 983,45 19.05 1.010,68
16" 406.4 9.53 1.001,43 12.7 986,17 21.44 1.013,40
18" 457 9.53 1.001,43 14.27 23.83
20" 508 9.53 1.033,23 15.09 26.19
24" 610 9.53 1.033,23 17.48 30.96
Nota:
1. U prezzu di sopra hè basatu nantu pipi BARE;
2. U prezzu di sopra hè basatu nantu FOB TIANJIN;
3. U prezzu di sopra ùn hè micca inclusu alcuna carica di imballaggio è di trasfurmazioni finali;
4. U prezzu di sopra hè validu solu durante u 10 di ghjugnu à u 17 di ghjugnu;
5. U MOQ applicabile per questa lista di prezzi hè più di 25 tunnellate;
6. Per più infurmazione è CIF prcie, per piacè cuntattateci;

Tempu di post: 11-ghjugnu-2021