API 5L/ASTM A53 GR.B (Pìoba Stàilinn ERW Trast-thomhas Beag)

API 5L/ASTM A53 GR.B (Pìoba Stàilinn ERW Trast-thomhas Beag)
Trast-thomhas a-muigh Tighead balla FOB TIANJIN Trast-thomhas a-muigh Tighead balla FOB TIANJIN
外 径 (mm) 壁 厚 (mm) an-diugh na sheasamh aig USD/TON 外 径 (mm) 壁 厚 (mm) an-diugh na sheasamh aig USD/TON
33.4
(1 ″)
2.1-2.4 523.62 mu 133 3.0-5.75 508.41
2.5-3.25 505.87 6.0-7.75 517.28
3.5-4.0 514.75 8.0-10 540.10
42.3
(1.2 ″)
2.1-2.4 522.35 mu 139.7
(5 ″)
3.0-4.5 509.67
2.5-3.5 518.55 4.75-5.75 517.28
3.75 522.35 6.0-7.75 542.64
4.0-5.0 528.69 8.0-10 555.32
48.3
(1.5 ″)
2.1-2.4 504.60 mu 152 3.0-4.5 523.62
2.5-3.25 499.53 4.75-5.75 526.16
3.5-3.75 513.48 6.0-7.75 538.83
4.0-4.25 528.69 8.0-10.0 560.39
4.5-6.0 528.69 mu 159 3.25-6.75 517.28
mu 60.3
(2″)
3.0-4.0 504.60 6.8-7.75 521.08
4.25-4.75 517.28 8.0-10.0 536.30
5.0-5.75 540.10 10.0-11.75 561.66
f73 3.0-4.75 519.82 mu 165 3.0-6.0 531.23
4.8-5.25 523.62 6.25-7.0 537.57
5.5-7.0 535.03 / /
aig 76.1
(2.5 ″)
3.0-4.0 500.80 / /
4.25-4.75 502.07 mu 168.3 3.5-5.75 522.35
5.0-5.25 508.41 6.0-8 528.69
5.5-7.0 526.16 8.25-8.75 536.30
mu 88.9
(3 ″)
3.0-4.0 499.53 9.0-9.75 545.17
4.25-4.75 502.07 10.0-11.75 569.26
5.0-5.25 508.41 / /
5.5-6.0 528.69 mu 177.8
(Φ180)
3.75-5.75 516.01
8 554.05 6.0-7.75 522.35
mu 108 3.0-4.5 494.46 8.0-8.75 529.96
4.75-5.75 497.00 9.0-9.75 541.37
6.0-6.25 517.28 10.0-11.75 554.05
6.5-9.0 564.19 / /
mu 114.3
(4”)
3.0-4.0 497.00 mu 193.7 4.0-6.75 523.62
4.25-4.75 502.07 6.8-7.75 528.69
5.0-6.0 509.67 8.0-9.75 547.71
6.25-7.75 533.76 10.0-11.75 562.92
8.0-10 579.41 / /
aig 127 3.0-4.75 504.60 mu 203 3.0-6.75 536.30
5.0-5.75 512.21 6.8-8.0 543.91
/ / 8.25-11.75 549.94
/ / / /
Thoir an aire:
1. Tha a 'phrìs gu h-àrd stèidhichte air pìob BARE;
2. Tha a 'phrìs gu h-àrd stèidhichte air EXW;
3. CHAN EIL a’ phrìs gu h-àrd a’ toirt a-steach cosgais pacaidh is giollachd deireannach;
4. Chan eil a' phrìs gu h-àrd dligheach ach eadar 3 Lùnastal agus 7 Lùnastal;
5. Tha an MOQ iomchaidh airson an liosta phrìsean seo nas àirde na 25 tunna;

Ùine puist: Lùnastal-04-2020